Apr 10
26
The build has started. Dropped by on the way home from work to find two beutifully built frames, levelled and screwed to the floor. And a very happy johnny admiring the work. Great work guys.
Eyemouth frame takes shape.
Followed by the St Abbs frame.
Well done! Now just need some more money to pay for the glue.
This entry was posted
on 26/04/2010 at 9:47 pm. You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.
Posted in Everything by Peter