Apr 10
27
Managed to get down to the workshop myself for a few hours, cut out the mould for the St Abbs boat. Eyemouth have progressed to the stage of glueing their first frame.

Looking down on the build. Eyemouth Boat to the top, St Abbs to the bottom.
St Abbs moulds cut out.
Eyemouth mould on stand.
Eyemouth begin Glueing Frames.
This entry was posted
on 27/04/2010 at 10:48 pm. You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.
Posted in Everything by Peter